Indore, Apr 28 (BNP): The Ratlam Division of Indian Railways has achieved significant savings on electricity costs by generating solar power across its network during FY 2025–26.
Officials said the division produced 35.53 lakh units of solar energy, helping it save around ₹1.84 crore in power expenses over the year.
The division has installed solar power plants with a combined capacity of about 3,300 kilowatts at various locations. These systems are being used to meet part of the division’s energy needs while reducing dependence on conventional electricity sources.
Mukesh Kumar, Public Relations Officer of the Ratlam Division, said the initiative has helped lower operating costs and supports Indian Railways’ focus on cleaner and more sustainable energy solutions.
Officials added that the use of solar energy is part of wider efforts within Indian Railways to improve energy efficiency and reduce its carbon footprint.
The development highlights how renewable energy adoption is helping railway divisions cut costs while moving toward greener operations.
Leave a Reply