Balimela, Sept 16 [UDN}:A joint field inspection was carried out by the Superintending Engineer, Earth Dam Division, Chitrakonda, alongside the Executive Engineer, RWSS, to evaluate the water sustainability of the Balimela Reservoir near Bisoyiguda village. This joint assessment is a key step toward securing necessary water allocation permissions from the Department of Water Resources (DoWR), ensuring dependable and sustainable piped drinking water supply for local communities. Department of Water Resources,

Leave a Reply